Lecture & Lab Notes by Y. Ahn  (from 2008~2011)

(A) GGE 2012, Advanced Surveying (Core Course; 4 Credits)

 

 

Date

Lecture Notes (right-click to save each file)

Description

06 Jan. 2011  Course Description ALL updated in 2011
11 Jan.  Surveying Basics (including field notes)  
13 Jan.  Various Distance Measuring Techniques  
18 Jan.  Control Surveys  

20 Jan.

 Precision Leveling

 

25 Jan.

 Heighting

 

27 Jan.

 Methods of Detailed Surveys,

 

01 Feb.

 3D Terrestirial Laser Scanning, video1, video2, Example of the Scanning,

 

03 Feb.  Control Survey II

 

08 Feb.

 Errors (cf. Galton Box or Probability Bean Machine)

 

10 Feb.

 Error Propagation

 

15 Feb.

 Mapping ProjectExample of Malta Precision Network

 

22 Feb.

 Mid-Term Exam

20%

24 Feb.

 Contours and DEM (with stereoscopoic images; anaglyph glasses needed)

 

01 Mar.

 DEM (continued)

 

03 Mar.

 Introduction of GNSS

 

15 Mar.

 Principles of GNSS Positioning

 

17 Mar.

 Tutorials of GPS field survey

 

22 Mar.

 Planning GPS Surveys

 

24 Mar.  Processing GPS Field Survey Data

 

29 Mar.

 GPS Control Networks, NB Control Monument User Guide (by SNB)

 

31 Mar.

 GPS Error Sources, GPS Cables Issues (use it after permission from author)

 

05 Mar.

 Additionals: GPS Group Projects at UNB/feedback forms

 

07 Apr.

 Review class / Final exam tutorials (LAST CLASS)

 

   

 

15 Apr.

 L.B. Gym Main, B10-11 (at 2:00 PM)Final Exam (Previous in 2010)

  50%
  All PreviousFiles_y2010_Zipped (~ 45 MB) : here  
  GPS_Data_2011_Collected (Zipped file (rar) ~ 3MB) : here

collected in 2011

 

 

(B) GGE 2013, Survey Practicum II (Core Course; 4 Credits)

Some Useful Lab Materials by Y. Ahn

Dates

LAB Notes (right-click to save each file)

Description

  Mid Feb.   Introduction of Trimble™ Terramodel S/W   for Contouring, and DTM
  Late Feb.   Traverse Calculation by Terramodel S/W  
  Early March   Trimble Geomatics Office (TGO™) and DTM Link   for Final Topographic Plan
  Late March

  GPS data processing by TGO™

  for field data processing
  March 2010   TOPCON HiPER-Lite Phase Center   correct APC (use this)

 

* Notes: If skipped relevant acknowledgements, please don't hesitate to contact me: yahn@unb.ca