Lecture & Lab Notes by Y. Ahn (from 2008~2011)
(A) GGE 2012, Advanced Surveying (Core Course; 4 Credits)
|
Date |
Lecture Notes (right-click to save each file) |
Description |
| 06 Jan. 2011 | Course Description | ALL updated in 2011 |
| 11 Jan. | Surveying Basics (including field notes) | |
| 13 Jan. | Various Distance Measuring Techniques | |
| 18 Jan. | Control Surveys | |
|
20 Jan. |
Precision Leveling |
|
|
25 Jan. |
Heighting |
|
|
27 Jan. |
Methods of Detailed Surveys, |
|
| 01 Feb. |
3D Terrestirial Laser Scanning, video1, video2, Example of the Scanning, |
|
| 03 Feb. | Control Survey II |
|
|
08 Feb. |
Errors (cf. Galton Box or Probability Bean Machine) |
|
|
10 Feb. |
Error Propagation |
|
|
15 Feb. |
|
|
|
22 Feb. |
20% |
|
|
24 Feb. |
Contours and DEM (with stereoscopoic images; anaglyph glasses needed) |
|
|
01 Mar. |
DEM (continued) |
|
|
03 Mar. |
Introduction of GNSS |
|
|
15 Mar. |
Principles of GNSS Positioning |
|
|
17 Mar. |
Tutorials of GPS field survey |
|
| 22 Mar. |
|
|
| 24 Mar. | Processing GPS Field Survey Data |
|
|
29 Mar. |
GPS Control Networks, NB Control Monument User Guide (by SNB) |
|
| 31 Mar. |
GPS Error Sources, GPS Cables Issues (use it after permission from author) |
|
| 05 Mar. |
Additionals: GPS Group Projects at UNB/feedback forms |
|
|
07 Apr. |
Review class / Final exam tutorials (LAST CLASS) |
|
|
|
||
| 15 Apr. |
L.B. Gym Main, B10-11 (at 2:00 PM), Final Exam (Previous in 2010) |
50% |
| All PreviousFiles_y2010_Zipped (~ 45 MB) : here | ||
| GPS_Data_2011_Collected (Zipped file (rar) ~ 3MB) : here | collected in 2011 |
(B) GGE 2013, Survey Practicum II (Core Course; 4 Credits)
Some Useful Lab Materials by Y. Ahn
|
Dates |
LAB Notes (right-click to save each file) |
Description |
| Mid Feb. | Introduction of Trimble™ Terramodel S/W | for Contouring, and DTM |
| Late Feb. | Traverse Calculation by Terramodel S/W | |
| Early March | Trimble Geomatics Office (TGO™) and DTM Link | for Final Topographic Plan |
| Late March | for field data processing | |
| March 2010 | TOPCON HiPER-Lite Phase Center | correct APC (use this) |
* Notes: If skipped relevant acknowledgements, please don't hesitate to contact me: yahn@unb.ca